Modifiche al passo #13
Righe Passo
[* black] When dry, remove clamp from fletching jig by holding the clamp open and lifting upward. | |
[* black] Remove arrow from the fletching jig and place a small drop of glue at the top and the bottom of the new arrow vane. | |
- | [* black] Let dry for 3-5 minutes. |