Salta al contenuto principale
Inglese
Italiano

Traduzione in corso passo 3

Passo 3
Use an adjustable wrench to unscrew the connection tube between the pump and the boiler. Pull off both tubes connecting on each side of the pump. Remove the 3 electrical connectors from the pump.
  • Use an adjustable wrench to unscrew the connection tube between the pump and the boiler.

  • Pull off both tubes connecting on each side of the pump.

  • Remove the 3 electrical connectors from the pump.

Inserisci qui la traduzione

Inserisci qui la traduzione

Inserisci qui la traduzione

I tuoi contributi sono usati su licenza in base alla licenza open source Creative Commons.