Salta al contenuto principale
Inglese
Italiano

Traduzione in corso passo 8

Passo 8
Using the Blunt Tweezers, remove the tape on top of the ZIF connectors for the gravity induction line and the touch line. These connectors are both located to the left of LCD Display Connector on the bottom of the screen assembly. These connectors are both located to the left of LCD Display Connector on the bottom of the screen assembly.
  • Using the Blunt Tweezers, remove the tape on top of the ZIF connectors for the gravity induction line and the touch line.

  • These connectors are both located to the left of LCD Display Connector on the bottom of the screen assembly.

Inserisci qui la traduzione

Inserisci qui la traduzione

I tuoi contributi sono usati su licenza in base alla licenza open source Creative Commons.