Modifiche al passo #4
Modifica in base a Mike K-
- Prima di
- Dopo il
- Invariato
Righe Passo
[* |
[* |
[* black] Continue working, in 1-1.5in segments, up the right size of the bezel, across the top, and down the left side. Do no work on the bottom edge yet. |
[* icon_caution] Only insert the spudger from the outer edge of the display assembly, and do not push it more than 6mm (1/4in) towards the inner edge of the bezel - otherwise you risk damaging a gasket between the inner edge of the bezel and the screen. |
Immagine 1
Vecchia Versione
Nuova Versione
Immagine 2
Eliminato