Salta al contenuto principale

Commercial 8 Quart Bowl-Lift Stand Mixer - Base/Foot Assembly Replacement

Cosa ti serve

    • Before starting ANY repair/disassembly of the mixer, make sure it is fully unplugged from the electrical outlet.

    • If this mixer is being used in a commercial environment, a LOTO tag can be affixed via the hole on one of the prongs on the mains plug to prevent accidental activation.

  1. Commercial 8 Quart Bowl-Lift Stand Mixer - Base/Foot Assembly Replacement, Removing the base/foot assembly: passo 2, immagine 1 di 2 Commercial 8 Quart Bowl-Lift Stand Mixer - Base/Foot Assembly Replacement, Removing the base/foot assembly: passo 2, immagine 2 di 2
    • Lay the mixer on its side, placing a dish towel or other soft material underneath to protect the finish.

    • Using a #3 Phillips screwdriver, remove the three screws (circled in yellow) attaching the base/foot assembly and mesh vent screen to the mixer column. Taking care to protect the mixer because the base/foot assembly will immediately come free from the mixer column when the last screw is removed.

    • Remove the mesh vent screen (noted in blue) and place it to the side for use during reassembly.

    • Begin reassembly with the replacement base/foot assembly.

Conclusione

To reassemble your device, follow these instructions in reverse order.

PedroDaGr8

Membro da: 08/12/12

2.971 Reputazione

15 Guide realizzate

0 Commenti

Aggiungi Commento

Visualizza Statistiche:

Ultime 24 Ore: 0

Ultimi 7 Giorni: 2

Ultimi 30 Giorni: 4

Tutti i Tempi: 127